PMI Logo
 
PMI Logo
Home  
Carbon Burn-Out Information  
Carbon Burn-Out Plant Construction  
Carbon Burn-Out FAQ  
PMI Feeder  
Ammonia Removal/Recovery  
Aardelite® Information  
In The News  
Technical Papers  
About PMI Ash  
Contact Us  

 
Nov 2012:
PMI Ash Technologies SVP named new American Coal Ash Association Chair
Press Release   Adobe Acrobat Document  Acrobat Document - 246 kb 


 
Dec 2010:
PMI Ash Technologies develops ammonia removal and recovery technology
Technical Paper   Adobe Acrobat Document  Acrobat Document - 228 kb 


 
August 2010:
PMI Ash Technologies SVP’s testimony to Congress on EPA’s proposed ruling on coal combustion residue.
Video   External Video  External Link (New Window)


 
March 2010:
PMI Ash Technologies to be Featured in Episode of “The Profiles Series” on The Discovery Channel on Thursday, March 11, 2010
Press Release   Adobe Acrobat Document  Acrobat Document - 27 kb 

Video   Internal Link  Internal Link

 
March 2010:
PMI applauded for making green use of coal ash - NewsObserver.com
Web Page   Web page  External Link (New Window)

Chesapeake Carbon Burn-Out Plant Construction
Chesapeake, VA

The following photographs are pictures of the construction sequence for the Chesapeake, VA Carbon Burnout facility.The photos step through the 18 month process of building a CBO facility from the ground up. See similar pictures of CBO construction at Winyah,SC.

Greenfield CBO site
Greenfield CBO site
 
Preparing land for the new construction
Preparing land for the new construction
 
Driving piles and dome foundation footer
Driving piles and dome foundation footer
 
Ringwall form for the storage dome
Ringwall form for the storage dome
 
Fluid bed form work foundation
Fluid bed form work foundation
 
FBC pad poured and storage dome has taken shape
FBC pad poured and storage dome has taken shape
 
Lower section of FBC in place
Lower section of FBC in place
 
Upper section of FBC in place
Upper section of FBC in place
 
Starting structural steel construction
Starting structural steel construction
 
Structural steel construction topped out
Structural steel construction topped out
 
Gas product cooler, hot cyclone set
Gas product cooler, hot cyclone set
 
Feed silo and process pipe bridge set
Feed silo and process pipe bridge set
 
Loadout and Control Room building erection started
Loadout and Control Room building erection started
 
Process ductwork in place
Process ductwork in place
 
Plant physically complete
Plant physically complete
 